Highlighting the progress of the corresponding horizontal structures slabs, having reached in northeast elevation +8.40 m, height of access to the upper deck,
Continue the remaining work, including in these the cantilever's high-stands, height +6.40 m, walls seen in almost all the perimeter of the stadium, stands, stands portagradas low beams and pile caps of the foundation of low stands in western sector .
Earthmoving work emptying inside the elliptical axis of the field are performed.