Highlighting the completion of the share of slabs zone boxes, elevation +3.02, between the lower ends of stands high horizontal structure, and level 5, elevation +4.20 m., And the beginning of post-tensioned slabs and the said level five.
In northern arm work continues outside perimeter fence by providing concrete walls. The structural and visual configuration of these walls retains essentially the same criteria that predominate in the work of the existing building; highlight the extent of elevation +8.40 m., on the outside wall.
Continues the execution of the foundation of low stands, pile caps in south, stands level 4-5 stairs and slabs in elevation +0.00 m.